As constructed drawings

As constructed drawings

Learn about As Constructed Drawings and access the ACDC instructional guide.

As constructed drawings, also known as ‘works as executed’ or ‘as built drawings’, are required for all North East Water assets.

The purpose of the As Constructed Design Certification (ACDC) Instructional Guide is to assist in the submission of as constructed drawings for civil works, specifically sewer and water mains and associated valves and nodes to North East Water.

As Constructed Design Certification (ACDC) standards define a set of data capture business rules to enable accurate and efficient capture of asset information. ACDC is very specific in its requirements.

If you need more information, please contact GIS@newater.com.au or the relevant North East Water project manager.

As Constructed Design Certification (ACDC) Instructional Guide